WATCH THE GROWTH OF OUR HORTICULTURE FACILITY
THIS IS A PHOTO TAKEN THROUGH OUR ENTRANCE GATE TO THE DRIVE THRU PARK.  THE NEW FENCE HAS BEEN INSTALLED, AND WE HAVE BEGUN TO DIG OUT THE FOUNDATION.   
 
 
 
 
 
 

THIS PHOTO WAS TAKEN ON MAY 9, 1999

 
THIS IS A VIEW OF THE CONSTRUCTION SITE SHOWING THE NEW FENCE LINE AND THE HOLE FOR THE BUILDING. 
 
 
 
 
 
 
 

THIS PHOTO WAS TAKEN ON MAY 9,1999

 
In this photo, Nick Sucec, a student at Douglas High School is working to plant a hedge screen along the fenceline behind what will be the Horticulture Facility.  This will screen the view from visitors driving through our Asian section. 
 
 
 

This Photo was taken on May 18,1999

 
In this picture, Ron Miller is driving the backhoe, delivering more Arborvitae for the hedge.  Nick is patiently awaiting more work.  Note that the gravel has been spread for the building.  On the 19th, a compactor will be delivered to compact the gravel in preparation for pouring the footings and the floor.  Wolf Creek Job Corps should arrive on Monday to begin construction. 
 

This photo was taken on May 18,1999

In this photo, Ron Miller is placing the last of the gravel for the footings and floor.  In total, 80 yards of 1" minus crushed rock was put down.  The footing gravel was 2' deep and 2' wide.  1' of gravel was placed for the floor over the black clay of the site.  The trench for the footing went down to the soft shale beneath the clay layer.
 

This photo was taken on May 21,1999

In the foreground, Bob Schneider is doing the finishing touches on the grading of the site.  Earlier, Ron had leveled the huge pile of muck that came out of the building side excavation.  Top Soil and zoodoo will be placed over the clay and lawn will be installed.  In the background, Ron is finishing up the gravel placement for the concrete pour.  We are now ready to form for the floor.
 

This photo was taken on May 21,1999

 